GARAGE & FACTORY FLOOR PROTECTOR

Garage and Factory Floor Protector is formulated on a modified polyurethane alkyd resin that provides a tough hard wearing film with good abrasion resistance and excellent durability.

Containing Slip Guard an additive which helps reduce the danger of slipping, drying to a pleasant low satin sheen. Primarily intended for use on concrete floors this product can also be used on brick, stone and timber if required. ideal for use on driveways, paths, carports, warehouses, garage floors, and timber decking. Will not lift under hot car tyres

DRYING TIME:
6 Hours between coats, 24 Hours – foot traffic

COVERAGE:
1L=10m2

SIZES:
2L, 4L, 10L

APPLICATION METHOD &
CLEANUP:
Paint Brush, Roller (fine-nap)

Mineral Turps clean up

Features:

  • Contains ‘Slip Guard’ to reduce slipping
  • Forms a tough hard wearing film
  • Good abrasion resistance
  • Excellent durability

COATS:
Minimum 2 Coats

FINISHES:
Black, Charcoal, Chestnut, Ferric Red, Granite Grey, Forest Green, RiverGum, Sandstone, Terracotta, White.

Tint bases: Deep Base, Extra Deep Base

COLOURS

STANDARD COLOURS

TINTED COLOURS

APPLICATION METHOD
Preparation

All surfaces should be completely dry and free from grease, grime, dust and other contaminants.

Test moisture content by taping a 30x30cm clear plastic sheet to the surface and leaving for 2 hours. If moisture is present on the surface after 2 hours leave to dry out further

Application

Apply by brush or short nap roller, do not spray. Ensure to stir well before use, do not shake.

Dilute the first coat with 20% clean mineral turpentine. This will facilitate penetration and promote adhesion

Drying

Allow to dry for at least 6 hours before applying a second undiluted coat.

Light foot traffic is permissible after 24 hours depending on the weather conditions at the time. Allow at least 48 hours before allowing heavy traffic.

Related
Products
Areas OF USE
GARAGE FLOORS
WORKSHOPS
PATHS
TIPS & FAQ’s
  • Concrete Surfaces  – Allow 6 weeks for newly laid concrete to cure before painting.
  • All bare concrete surfaces should be acid etched prior to application with a 1:10 hydrochloric acid and water solution. Broom this solution over the surface and allow to stand for 15 minutes (but do not allow it to dry on surface) before thoroughly washing the surface with water. Properly etched concrete should feel like sandpaper so more than one application may be required.
  • Allow surface to dry for at least 3 days after treatment before painting.
  • Do not use below 10º C, or above 30º C.
  • Remove any loose or flaking paint by wire brushing, sanding or using a high pressure water cleaner.
  • For unpainted timber surfaces, sand thoroughly and dust down. Fill nail holes and cracks before painting.
  • If conditions are warm, thinning additional coats with no more than 5% clean mineral turpentine will ease application.
  • Combine cans for an even colour finish.
  • Apply on a test area for product suitability and adherence.
PROJECTS

MONOCEL COVERAGE
CALCULATOR

Get our Coverage Calculator
Available FREE ofor Apple & Android phones

LETS CHAT!

OUR DETAILS

HEAD OFFICE

Unit 2, 115 Belmont Avenue
Belmont 6104
Western Australia

Phone: (08) 6272 3800
Fax: (08) 9277 4068

Menu
Review Your Cart
0
Add Coupon Code
Subtotal
Total Installment Payments
Bundle Discount